Couple guys asked if I could post some pics of this kit on a GTO.
Took me about 16 hours total to install this kit and bleed the system.
Took my time and did everything slow. Saftey wiring the front rotors took about 30 minutes each.
The rear OEM dustshield needed to be cut off, brackets fabbed up and some other things.
I pulled out all the OEM fluid and filled it with Wilwood EXP600.
I plan on bedding them on my way to Starlite on Friday.
Bookmarks